/   Projects   /   Briquette plant
BRIQUETTE PLANT PROJECT

Project originator: UGUUMUR ALT LLC

Location: 410 km southeast of Ulaanbaatar, 85 km northeast of Sainshand soum, 15 km southeast of Altan Shiree soum center, 35 km from the newly built railway in Altan Shiree soum

Description: The unconnected briquette plant is planned to have a capacity of processing 1,000,000 tons of raw coal per year.

It is estimated that up to 45% of the weight of coal entering the raw material will be lost during coal processing to reduce moisture, reduce ash and remove volatile gases, and 550,000 tons of product will be produced annually from 1,000,000 tons of raw coal.

During the 27 years of the mine's operation, a total of 26.1 million tons of 40% moisture 2800 kcal / kg coal will be processed with a yield of 55-60% and 15 million tons of 6-11% moisture 5000-5800 kcal / kg briquettes will be produced.

 